The crew finished a major restoration project in a chemical containment room located at a wastewater treatment plant.
The concrete floor had deteriorated due to years of exposure to chemicals. We removed the contaminated concrete, installed new structural steel rebar, poured new concrete and finished with a high chemical resistant epoxy coating to protect the new concrete floor.